Circuit breaker manufacturer provide 2P 25amp 220V 415V 6000A breaking capacity dz47-63 circuit breaker good quality
Specifications
BEST QUALITY AND COMPETITIVE PRICE
FAST DELIVERY TIME
MCB Series |
L7-63 High Breaker Capacity Mini Circuit Breaker Specification |
Electrical Specification | | Conform to standard of electrical: | EN60898(IEC898) GB10963-99 | Rated current(Ue): | 230V/400V;50/60HZ | Rated breaking capacity: | 10KA IEC898(0.5-63A) 15KA IEC947-2(0.5-63A) | Short circuit breaking capacity of DC: | Max.48V(XYDB7...,10KA)single pole Max.250V(XYDB7-DC,6KA)single pole | Perfermance: | C,D charactisistic curve | Max.fuse that can be connected to: | 100AgL(>100KA) | Selective grade: | 3 | Working ambient temperature: | -5 to +40 | Enclosed protective class: | P40(Under mounting) | Electrical Life | Not less of 8000 times swithing operation | Mechnical Life | Not less of 20000 times swithing operation |
| Specification The length of exposed plane: | 45mm | Encloseure height: | 80mm | Encloseure width | 17.5mm per pole(single pole) 35mm:1P+N(two pole) | Mounting manner: | Used for track of 35mm of IEC standard | Terminal manner: | Two-function terminal can connect with bubar and conducting wire | Terminal block capacity: | Wire 1-25mm2 |
|
| |
|
|
|
|
Characteristic Curve

Dimensions

Product adventages:
Features: | Din rail Type Mcb |
| Biggest Quantity For Useage |
| Cheapest Type And Very Stable Quality |
| Used by All Over The World |
Quality: | Passed CE, CB Test |
Others (price,package and service)
Certification : | CE, CB, SGS, ISO 9001:2000 |
Packing: | 12P in a inner box, 240P in a carton |
Delivery date: | around 20-25 days based on your order quantity |
MOQ: | 500pcs |
Supply Ability: | 100,000pcs/month |
Payment Term: | T/T, L/C or others for negotiation. |
Samples Offer: | SHCET will offer free samples in reasonable quantity for customer quality checking. |
Samples arrangement: | Samples will be prepared to sending in about 3 working days. |
(And DHL 3-5days; UPS 3-5days; Fedex / TNT 3-5days; EMS 7 days to reach destination) |




